Focus Hospital – Fondazione Policlinico Gemelli – Rome
Focus Hospital Rome: AirFlow Ultra for the Orthopaedic Operating Theatre
For the refurbishment of the Orthopaedic Operating Theatre at Focus Hospital – Fondazione Policlinico Universitario Agostino Gemelli IRCCS in Rome, Nicfa® AirFlow Ultra was selected: the intelligent and adaptive filtration system within the Nicfa range.
AirFlow Ultra integrates the Nicfa Smart System, which continuously monitors environmental parameters, analyses data in real time and automatically regulates the filtration ceiling, maintaining ISO 5 conditions even in operation, without interruption.
The system dynamically adapts airflow to the operating conditions of the room, detects any anomalies and automatically optimizes system performance. When no activity is detected, ECO mode helps reduce energy consumption and operating costs.
All parameters are also recorded and stored in the Digital Environmental Record, making objective data available for analysis, verification, audits and full traceability of operating conditions.
A solution designed for healthcare facilities focused on control, automation, data and efficiency, transforming the filtration ceiling into an active component of operating room management.
Project Status
Completed
Client
Focus Hospital – Fondazione Policlinico Gemelli – Rome
Facility Type
Orthopaedic operating theatre
Completion date
May 2024
Location
Rome - IT






Selected projects

Policlinico San Giorgio, Pordenone: AirFlow Ultra for two ISO 5 operating rooms
Scopri progetto

Focus Hospital Rome: AirFlow Ultra for the Orthopaedic Operating Theatre
Scopri progetto

Padua Children’s Hospital: AirFlow Ultra for the new operating rooms
Scopri progetto
Whether you are designing, driving or caring, we are at your side with expertise and vision.
Write to us for technical support, personalized advice or insights into the system that best suits your needs.




